• Wartungsgrube

Tramway / Regional railway / Railway

Typ MSG 400 Tramway und Typ MSG 168 Railway - Patent granted

  • Low empty weight.
  • All accessories are assembled, piped and wired at the plant.
  • No installation work required at the site of installation, and all connections available according to overall planning.
  • Installation time reduced to 5 hours due to special installation technology.
  • Certified according to WHG.
  • Accredited according to: WHG § 62 / VAwS (AwSV) / TRwS (779 / 785 / 786), ArbSchG / BetrSichV / GefStV, incl. fire prevention and explosion prevention, TRBS 2152 / TRGS / ArbStättRL, VdTÜV-MB 967, DGUV.
  • Approved, type tested and certified by the Deutsches Institut für Bautechnik (DIBt - No. Z-38.5-278).
  • Working load acc. to the load model by the German Federal Railway UIC 71.
  • ISO 9001:2015 certified manufacturing plant.
  • Product quality at the highest level.
Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
More information Ok