Bahn
Werkstatt- und Fahrzeugtechnik Balzer
 
 
 
 
 
 

 

 
  Tramway / Regional railway / Railway
 
 
Type MSG 102 W
- One piece prefabricated installation pit up to 40 m long and more.
- Self-supporting filled-chamber honeycomb with integrated shell and reinforcements.
- Low empty weight.
- All accessories are assembled, piped and wired at the plant.
- All connections are available according to overall planning.
   
   
 
Straßenbahngrube Bahngrube Grube Balzer
   
   
 
- Installation time reduced due to special installation technology.
- Certified specialists according to § 19 I WHG
- Accredited according to: WHG § 19 i.l.g., BGR 157, UVV, VBG, VbF, Re. Si. Ve., certified
- ISO 9001 certified manufacturing plant.
- Quality products - the better solution in the long run.
   
 
     
 
 
 
 
Werbeagentur Konzept-G Memmingen